Skip to content
pl/en

Electrical installations for warehouses, industrial plants and commercial buildings

We design and deliver complete electrical installations — from the main switchboard to the last luminaire. With measurements, as-built documentation and a schedule that holds.

  • 1

    team runs the electrical, ICT and BMS trades — zero inter-trade interfaces

  • 5 days

    for a documentation audit before the offer is submitted

  • 100%

    of measurements and protocols ready on handover day

  • 0

    uncontrolled shutdowns when working in a live facility

Why NESS and not a typical electrical contractor

01

Value engineering before the offer, not after the problems

Before you sign the contract, we analyse the design and show where cost can be cut without changing parameters: optimized cable routes, luminaire selection, staged deliveries. A typical contractor prices what is in the design — we first check whether the design is optimal.

02

Electrical works designed together with ICT and BMS

One team runs these trades, so routes, risers and switchboards are coordinated at the design stage — not on site, where a clash means downtime and a claim.

03

Handover without surprises

Measurements and as-built documentation are produced in parallel with the works. At handover we put a complete set of protocols on the table — not a promise that the paperwork will follow.

04

Works in live facilities

We replace switchboards and upgrade installations in operating plants: staged works, temporary power supply, shutdowns only in agreed service windows.

Detailed scope

  • Main and distribution switchboards
  • MV/LV transformer stations
  • Feeders and cable routes
  • Power and socket installations
  • General, emergency and escape lighting
  • Lightning protection and earthing
  • Electrical measurements and protocols
  • As-built documentation

How we deliver

  1. 01

    Audit

    Review of the design documentation or an audit of the installation on site.

  2. 02

    Value engineering & proposal

    A proposal with concrete parameters and identified savings potential.

  3. 03

    Execution

    Works to the agreed schedule, weekly progress, cost and risk reports.

  4. 04

    Measurements & handover

    A complete set of measurements, protocols and as-built documentation on handover day.

Who it is for

General contractors

The full electrical package from a single subcontractor — no inter-trade interfaces.

Industry

Upgrades and switchboard replacements without stopping production.

Developers & investors

A predictable budget and documentation ready for acceptance.

Send us your documentation for an audit

Within 5 business days we will flag the risks and the savings potential in the electrical scope.

Request a free audit